Hey i have honestly looked through every single SQ thread i could possibly find and couldnt find my specific answer. I have accepted my job as a combat engineer, and i know you guys were or still are engineers. I got my information package from the CFRC and it said BMQ is 13 weeks (not a shocker) but it said after that my SQ is 10 weeks. I could have sworn it was 4 weeks for all trades but i guess i was wrong, I tryed calling the CFRC but no one picked up, I didn't want to resort to asking it on the site but here i am. I can't imagine they would be lieing to me about the ten weeks, but ive never heard of it before yesterday, so if you could just let me know what the deal is there that would be more than perfect. Thanks alot