- Reaction score
- 0
- Points
- 210
Assuming the politicians extend the mission beyond Feb 07, and TF 1-07 actually gets deployed, etc etc.. Would it be realistic to assume TF 3-07 will be handed to LFCA like 3-06 was? And, building on THAT assumption, would the timeframe for selection, pre-training etc be the same as 3-06 was?